June 13, 2011

Concrete done

Filed under: House — pawinemaker @ 7:18 pm

Last Thursday was concrete prep, and Friday the concrete floors were poured. It was not possible to get inside and get good pictures. But on Monday, everything was nice and dry. Some additional framing work was also done, as well as the back french doors were put in. Electrical work was done the previous two days, and the outlet in the back is also visible.

This is the view from the inside.

The garage door was also installed.

Floor in the family room.

Framing for the closets and for the 3/4 bathroom in the utility room.

Here’s the basement floor. On hindsight, should have probably used the flash.

Advertisement

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Theme: Silver is the New Black. Blog at WordPress.com.

Follow

Get every new post delivered to your Inbox.