Last Thursday was concrete prep, and Friday the concrete floors were poured. It was not possible to get inside and get good pictures. But on Monday, everything was nice and dry. Some additional framing work was also done, as well as the back french doors were put in. Electrical work was done the previous two days, and the outlet in the back is also visible.
This is the view from the inside.

The garage door was also installed.

Framing for the closets and for the 3/4 bathroom in the utility room.

Here’s the basement floor. On hindsight, should have probably used the flash.