May 22, 2011

Block Work Done

Filed under: House — pawinemaker @ 8:26 pm

The block work was finished in the middle of all the rain last week. The waterproofing was supposed to happen Friday, but apparently he was backed up from the previous rain, and most of the foundation was still quite wet. Now everything moves up a day. On Saturday, we had three more truckloads of #4 delivered, and used in front of the garage, which had been turned into a mud pit by all the heavy trucks driving in there. The limestone dust was put at the bottom of the hill after we patched it up. At first it looked like someone skid the whole way up the hill, but then it became clear that it was a trailer brake that was locked and dragged halfway down the hill.

Here’s the view from the front. Garage is on the left.

The basement and family room:

The basement has an egress window. This shows the inside and outside views.

The foundation as seen from the back of the house. The hillside here gives a nice vantage point.

Advertisement

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Theme: Silver is the New Black. Blog at WordPress.com.

Follow

Get every new post delivered to your Inbox.